Innovation 2021

The standard for sealing and insulation of doorframes with jambs covers selected relevant issues related to the design, execution and functions of the insulation layer and sealing layers, as well as the requirements for the level of air tightness, resistance to the ingress of rainwater into the interior, and thermal insulation of the junctions of doorframes with jambs, which should be met as a result of the proper execution of the installation work of woodwork in WINS integrated 3-layer installation and insulation systems.

WINS 3-layer sealing and insulation systems are:

  • very high resistance to adverse weather conditions,
  • tightness,
  • extremely high UV resistance - 10 years,
  • ease of application,
  • time-saving installation and sealing of the joint,
  • no need for special substrate preparation and priming of the reveal,
  • versatility - independent of joint width,
  • energy efficiency.

Table of contents Standard Selena

WINS' new technology for sealing and insulating woodwork during installation was developed in conjunction with installers, responding to growing expectations of installation time and quality for the highest user comfort and energy efficiency in buildings.

The compendium of knowledge "Standard for insulation and sealing of junctions of frames with frames" contains information on WINS three-layer insulation. And answers the questions:

  • why is it important ?
  • how to do it ?
  • what to do it with ?

What you'll find in the Selena Standard:

1. Energy performance of the building

In the Selena Standard you will find details on the design and installation of an energy-efficient joint in response to the growing energy requirements for buildings. The European Directive on the Energy Performance of Buildings, which is in force in all countries of the European Union, stipulates that from 2021 all newly constructed buildings must meet the standards of a low-energy house. For buildings constructed by public investors, the regulations are already in force as of January 1, 2019.

2. Basic parameters of the energy-saving junction between the frame and jamb

Air tightness, weather resistance, water vapor diffusion, temperature factor, thermal and acoustic insulation are the key parameters describing the requirements for sealing and insulating the junctions between frames and jambs, set by both investors and regulations. Learn the technical details on the energy-saving joint

3. Factors affecting windows during operation

From the moment a window is built into the jamb of a structural wall, the junction between the frame and the jamb, as well as the insulation and sealing systems used, are subject to variable forces from loads caused by a number of external and internal factors, such as atmospheric phenomena, the dead weight of the window structure, object movements, operation, intrusion attempts, impacts, noise, fire, and internal room climate. Learn about the challenges facing contractors as well as partition designers for the coming years.

4. Technical documentation of the installation of windows and balcony doors

Check out the details of the complete and necessary technical documentation, as well as the necessary elements of a proper window and balcony door installation project, along with references to legal regulations.

5. Installation planes - sealing zones in the connection of the windows with the reveals

Learn about the 3-layer insulation and sealing model designed for varying external and internal conditions, factors and phenomena affecting windows, and the 3 zones of sealing and insulation of frames with jambs.

6. Elimination of condensation and fungus in the joint

Properly designed junction of the jamb with the frame is also important because of the various possibilities of moisture in the partitions also already during the operation of the building, Check the influence of the temperature coefficient on the evaluation of the quality of window installation.

7. Moisture movement in the partition

Thermal and moisture conditions, as well as heat and moisture transport in buildings and building elements, are interrelated yet highly variable. See details on the design of a jamb-to-frame seal in which there is controlled, uniformly effective moisture removal from the joint.

8. Sealing of window-frame joints - formal requirements and responsibility for quality of workmanship

Learn about the key regulations for sealing frame-to-frame joints, and check the contractor's responsibility in terms of installation work and technical parameters of the joint.

9. Design of seals of the connections of windows to the frames

Read about the necessary elements of the design of sealing joints between frames and jambs as the basis for the smooth execution of a professional and efficient installation, Careful design of structural connections for windows and exterior doors has a major impact on construction work, and thus affects the durability and suitability for use of the installed elements.

10. Conditions and requirements for proceeding with the installation of windows and balcony doors

See the list of conditions for proceeding with the installation and replacement of windows, the requirements for the connection of windows and balcony doors to the building, as well as the rules for the acceptance of windows and balcony doors before installation.

11. Connections between windows and reveals - expansion gaps

One of the prerequisites for proper window installation is the transfer of forces from the window to the building structure caused by external influences.

In any case, when designing the width of expansion joints, it is necessary to take into account not only the compensation of forces from loads caused by the phenomenon of linear expansion, but also the appropriate transmission of forces from wind loads, which involves the need for the proper selection of materials and means used to make mechanical connections of the window structure with the structural masonry.

12. Preparation of structural masonry jambs for window installation

One of the conditions for proper window installation is the transfer from the window to the building structure of the forces caused by external influences. Check the technical details of how to perform insulation and sealing, taking into account the movements of window structures in both directions and adjusting the width of expansion joints to the expected amount of displacement, the properties of the insulation material, and the properties of the materials used to make seals.

13. Location of windows and balcony doors in the reveal

The location of windows in the opening of a new building should be specified in the design and technical documentation, depending on the type of construction and thermal-moisture optimization.

14. Insulation and tightness of joints - level of requirements according to Selena quality standards

To meet the expectations of contractors and investors and bearing in mind the highest quality of materials for insulating and sealing window-frame joints, the Standard for sealing and insulating window-frame joints, developed by Selena, specifies the key parameters of a properly insulated joint. Check the requirements for resistance to rainwater penetration, air permeability and the values of temperature coefficient and linear heat transfer coefficient.

15. Thermal and acoustic insulation of the window joint

Thermal and acoustic insulation of the joint are the main parameters affecting the comfort of the premises, quickly felt by users. Learn about the factors of insulation measurement that affect the acceptance of installation work.

16. Technological guidelines

Check out the technological details for working with products in WINS 3-layer sealing and insulation systems. Only properly executed 3-layer joint sealing provides a sound barrier, protecting the interior of the building from outside noise and eliminates uncontrolled heat loss from the building.

17. Acceptance of installation works

Learn about the set of parameters and areas to be evaluated during the acceptance of installation work.

18. Answers to common questions

Read frequently asked questions and answers about WINS products.

19. Selena sealing systems - selection of materials

See three proven insulation and sealing systems, based on materials manufactured and supplied by Selena, designed for professional insulation and sealing, the use of which, in accordance with the recommendations and guidelines of the Selena Standard, makes it possible to achieve a result that exceeds the quality standard set based on the requirements of the Minister of Infrastructure Regulation of April 12, 2002 on the technical conditions to be met by buildings and their location, (Journal of Laws 2019, item 1065) and in line with the trends of highly energy-efficient buildings

20. New standard for window insulation and sealing based on liquid films

Meet WINS systems, innovative 3-layer systems for insulating and sealing junctions between the jamb and frame. The systems regulate the flow of water vapor in the joint and inhibit uncontrolled air infiltration, resulting in improved energy and acoustic efficiency of the joint. WINS systems consist of integrated products that, when used as a system, provide the junction of the jamb with the Selena Standard of insulation and sealing.

21. Integrated three-layer window sealing and insulation systems

Check out the details on the three innovative jamb-to-frame insulation and sealing systems WINS Flex, WINS Fast and WINS Fix. They consist of materials designed to insulate and seal within properly designed expansion joints and ensure that the highest results are achieved in terms of thermal transmittance, sound insulation and resistance to rainwater penetration.

22. Sealing system - WINS FLEX

WINS Flex is an innovation for new and demanding installations. Highly flexible, highly resistant to extreme weather conditions 3-layer window installation system, requiring no special substrate preparation. It protects even the largest windows from deformation, perfectly transmits all building vibrations and maintains tightness even under heavy loads.

23.Sealing system - WINS FAST

The WINS FAST system-including a different type of mounting foam-was one of the solutions tested early in the system's history. It was phased out in early 2022 and replaced in all functionality by WINS FLEX.

24. Sealing system - WINS FIX

WINS Fix is an innovation for quick window replacement and renovation, including in historic buildings. It is distinguished by the ease with which it seals windows in walls with a corner without disturbing the outer layer of the facade. It provides a weatherproof seal and sound insulation.

25. Examples of the implementation of the junctions of frames with thermal and moisture parameters

Take a look at the compendium of knowledge on how to make frame-to-frame connections in different types of walls. See technical drawings and practical tips for installation work.

26. Materials for insulation and sealing of window-frame joints SELENA

Learn about the products available in WINS 3-layer systems, details on easy application and faster installation, as well as technical parameters of the solutions.

27. Protocol of acceptance of construction works

Check out the details of professional acceptance of construction work before window installation and before and after installation.

Glossary

See the WINS systems glossary.

Legal requirements

See current regulatory requirements for WINS systems.